Tutorials

Step-by-step work with visible agents

Practical walkthroughs for setting up Argo, carrying context, delegating work, and reviewing outcomes before the next handoff.

Set upBring context aboardDelegateReview
Suggested sequenceStart small, then review what changed

Tutorials should leave you with a concrete outcome, a review point, and one next resource to continue the practice.

Start here

The first active loop.

10 min / Start here / Draft

Set up Argo for Mac

Install the Mac app, connect an account, and confirm that the remote workspace is ready for authenticated work.

Argo is installed, signed in, and ready for the first continuity loop.

Preview topic

15 min / Start here / Draft

Create a continuity brief for one active loop

Capture the purpose, current state, constraints, and next review point for work that should not reset between sessions.

One project or decision has a concise brief that can be carried forward.

Preview topic

By workflow

Find the walkthrough for the job.

Mac app

Mac app tutorials

10 min / Start here / Draft

1. Set up Argo for Mac

Install the Mac app, connect an account, and confirm that the remote workspace is ready for authenticated work.

Argo is installed, signed in, and ready for the first continuity loop.

Draft

Continuity

Continuity tutorials

15 min / Start here / Draft

2. Create a continuity brief for one active loop

Capture the purpose, current state, constraints, and next review point for work that should not reset between sessions.

One project or decision has a concise brief that can be carried forward.

Draft

Delegation

Delegation tutorials

18 min / Intermediate / Planned

4. Delegate a research task with approval points

Frame a bounded research handoff with visible scope, stopping points, and a reviewable result.

A research task has clear boundaries, approval points, and a result format.

Planned

Memory

Memory tutorials

12 min / Intermediate / Planned

3. Review memory before delegating work

Inspect the context Argo is carrying before handing off a research, planning, or follow-through task.

Relevant memory is checked and corrected before delegated work begins.

Planned

Trust

Trust tutorials

14 min / Evaluative / Planned

5. Review what changed after a handoff

Check results, memory changes, unresolved questions, and next steps before trusting work to move forward.

Delegated work is reviewed with visible evidence and clear follow-through.

Planned

Tutorial standard

Every tutorial should end with review.

Future tutorial pages should include prerequisites, expected outcome, concrete steps, a review point, and the next resource.